top of page

Projects

Airport Metro Connector (AMC)
1.jpg

The future Airport Metro Connector (AMC) includes a light rail station for Metro K Line, bus plaza, bicycle parking, customer service center, passenger pick-up and drop-off area, and direct connection to the future LAX Automated People Mover (APM) to provide more options for travelers and employees to get to the airport. Once in operation, this new station, known as the LAX/Metro Transit Center Station, will let riders transfer quickly and easily between LAX and Metro's network.

Additional project information is available on the Metro website: https://www.metro.net/projects/airport-metro-connector/

 

AMC will be CalGreen Tier 2 compliant and LEED Gold certified through the implementation of sustainable building features that include:

  • Stormwater capture and reuse for irrigation

  • Solar power onsite generation/photovoltaic panels

  • Enhanced commissioning

  • Energy and water conservation

  • Brownfield redevelopment

  • Indoor Air quality

 

Global ASR s currently providing environmental compliance support services during the ongoing construction of AMC in the following scopes of work:

 

  • Storm Water Pollution Prevention Plan (SWPPP) compliance inspections and review of contractor submittals

  • Review of environmental submittals for compliance to project specifications and regulatory requirements

  • Construction noise and vibration oversight

  • Oversight of hazardous materials abatement including Treated Wood Waste (TWW), Lead-Based Paint (LBP), and Asbestos-Containing Materials (ACM/ACCM)

  • Fugitive dust compliance inspections for South Coast Air Quality Management District (SCAQMD) Rule 403 requirements

  • Contaminated soil management oversight including manifest signing and SCAQMD Rule 1166 oversight

  • Sustainability Plan compliance oversight - CalGreen Tier 2 compliance

  • LEED certification support including oversight of enhanced commissioning

  • Green Construction Policy (GCP) compliance oversight including periodic onsite equipment audits

  • Mitigation Monitoring and Reporting Plan (MMRP) reporting oversight

  • Regulatory agency coordination and reporting

2.jpg
3.jpg
bottom of page